Pulsafeeder Pulsa GLM DM7 Uživatelský manuál Strana 12

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 33
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 11
12
6. Start the pump at the zero stroke length setting and slowly increase the setting to 100 to
prime the pump. If this does not work, it will be necessary to fill the suction line.
7. Filling of the suction line will necessitate the use of a foot valve or similar device at the end
of the suction line so that liquid can be maintained above the reservoir level. Remove the
suction valve assembly, fill the line, replace the suction valve, then remove the discharge
valve assembly and fill the reagent head as described in Step (3) above. The pump will now
self-prime when started up per step (4) above. Use appropriate precautions if handling
process fluid. Ensuree that any other fluid used for priming is compatible with the product
that will be pumped.
Figure 6, process
flow
Zobrazit stránku 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 32 33

Komentáře k této Příručce

Žádné komentáře